Belvedere Update 30
May 28, 2013
This might not be the most exciting for everybody but the garage floor is finally in and the last bay of the garage has been closed in. The walls and ceiling have been spray foamed and are ready for drywall. This is one of the last big things that has been left open since the third bay of the garage was our only access to the back of the site. Another big step under way is the laying of the Wausau...