2019 Residence – Phase 2 – 2

Another update at 2109! All exterior framing and cladding is done. House wrapped and ready for siding and trim. A dormer was added at the back of the house to improve the space in the upstairs bedroom. Interior framing and the first good view of the upstairs bedroom looking back toward the existing house. Another view of the new expanded bedroom, looking toward the new dormer. Also framed out are the openings for the built in storage...

Belvedere Update 35

We've posted these on our Facebook page but in case you haven't seen them or your like a bit more description, here we go! Here are two views of the arcade from the exterior. There is a lot of landscaping that still needs to be done and the driveway and walks are still a giant hole. The house itself is pretty much done and the clients have moved in and love the way it turned out and how the light changes...

Belvedere Update 25

This is a long post, so get ready because there are some cool things in it starting with this first pic. There have been delays due to site work and details but the bridges are finally on site. The steep site requires a unique installation path. To get the bridges to the downhill side of the house they were lifted over the entire house and lowered carefully into place. They actually approached the limits of this crane not due to weight...

Belvedere Update 20

Another site visit our at Belvedere. Blue tarps are gone from the front entry but all of the beautiful cast stone is now covered in pink foam to protect it for the rest of construction. Progress continues on the exterior stone and cast stone and upper terrace.  The bevel is also cut on the perimeter cast stone. The waterproofing and tile is installed in the screen porch. Any water that goes through the screens will drain out behind a trim piece and...