update Tag

RDM Architecture / Posts tagged "update"

2019 Residence – Phase 2 – 2

Another update at 2109! All exterior framing and cladding is done. House wrapped and ready for siding and trim. A dormer was added at the back of the house to improve the space in the upstairs bedroom. Interior framing and the first good view of the upstairs bedroom looking back toward the existing house. Another view of the new expanded bedroom, looking toward the new dormer. Also framed out are the openings for the built in storage...

5235 Residence

You've already seen a couple of these images but here is a bit more info about that project. Below are some photots of the existing kitchen. It is a little dated and doesn't quite fit the way the homeowners cook and was too closed off from the rest of the house. Our design opened up the kitchen into the living room and also expanded it into the weird small pantry and laundry room that the previous owners had created....

Stair Rail

We love to work on projects of every scale here and this is a perfect example of a smaller scale project and another successful collaboration with Pascal at Meya Metalworks. The existing steel tube railings didn't match the style of the house and didn't meet code (also they were ugly). We came up with some preliminary design ideas and then worked with Pascal to come up with a final design and details. The client collects classic sports cars and...

1232 Residence Update 3

Making quick progress on the 1232 Residence, framing is getting close to complete, stucco starts next week. It is starting to take shape. In order to keep the homeowners in the kitchen as long as possible a temporary wall has been erected until all the exterior work is done to the point that the expanded family room is weather tight. With doors and windows going in it looks like that point isn't all that far away. ...