2019 Residence-Phase 2-4

A glare-filled picture but paint and trim are all done and it looks great. We also added some width and an overhang to the existing dormers to bring them into scale with the rest of the house and replaced the existing siding, windows and trim. A view of the rear of the house. Trim and siding is wrapped up. Just a little bit left. A finished shot of the upstairs bedroom. The clients did hand-drawn linework on the walls and picked a...

Belvedere Update 26

Another Belvedere post! We are now into the finished stuff. The stone front porch with brick edge is done as is the water element next to it. There is some beautiful stone work just on these two parts and they make a great introduction to the house. The stone fireplace install continues. The hardest part is done. The main mantel is one large piece and weighs around 1800 lbs. It was rolled into place using rigging and a cart...

5400 Residence 5

Here we are at present day! Trim is complete, the arbor is just about done with the exception of a few small pieces as is the siding and the doors and windows. It is looking great and with the nice weather, hopefully we can get it painted and mostly wrapped up. The interior is ready for paint and trim. In the photos below you can see the operable platform and it's opening in the loft storage space. Operated by...

Belvedere Update 22

A little update on Belvedere! Stone work on the patio is moving along. The columns are all have stone now, as well as the outside of the pool. Tile work on the inside of the pool has started as well. You can also see the fantastic view of the lake. On the interior, trim work continues. Below is a shot of the doors to the lower terrace from the gathering room. Ignore the "stunt" doors and look at that...

Belvedere Update 20

Another site visit our at Belvedere. Blue tarps are gone from the front entry but all of the beautiful cast stone is now covered in pink foam to protect it for the rest of construction. Progress continues on the exterior stone and cast stone and upper terrace.  The bevel is also cut on the perimeter cast stone. The waterproofing and tile is installed in the screen porch. Any water that goes through the screens will drain out behind...

Belvedere Update 19

A hot day out at Belvedere for a site visit but things on the interior and the exterior continue to move along despite the weather. Here is a view of the front of the house, the masons have made a little tarp fort for themselves as the sun just beats down on the front of the house. This is what is happening behind the tarps. The cast stone has arrived and is going up at the columns on the...

1232 Residence Update 4

Just a quick update today, if you want to see more you can check out the Facebook Gallery here.  Below is a before and after shot of the East side of the addition. You can see the metal mesh is in and the metal corners at the pilaster. All the doors and windows are in and trimmed out on the exterior. As of yesterday it seems like fall has started so we are now in a race with the elements...

Bird House Studio Update 3

Here's a quick update to the birdhouse studio and a couple images. The exterior trim and siding is all done as well as the paint and concrete flat work. Theres a little work left here and there and the grading and plantings. With the new stone wall and concrete walk the drainage problems are solved for good and the client is happy. Stay tuned for the final pictures. ...