Deck + _ 3

The outdoor kitchen was expanded during construction, adding the leg to the straight run to give them a little more space for cooking and seating. The stucco and the cut stone top are in. Looks awesome. A shot of the large arch, now in stucco as well as the columns. The deck and the trim are mostly installed and the rail is the next major part. With the dry-below system we are able to have a finished ceiling...

Belvedere Update 31

Belvedere keeps moving forward! Site work continues and little by little the piles of material are getting smaller. The third bay of the garage is ready for stucco and the adjacent retaining wall is done. Final colored coat of stucco is on and looks great. The screen porch is stuccoed as well and the screen frames and wood paneling will finish off that side of the house. The wrought iron railings on the adjacent deck are in and now the roofing...

Belvedere Update 24

Construction on the Belvedere is progressing with the installation of the stucco base coat. The photo below is a view of the north elevation looking up from Lakeshore Drive East. Construction of a retaining wall will start soon that will terrace the yard from the street up to this side of the house. All of the masonry has been by Architectural Masonry & Restoration and their work has ben exemplary. From the full stone veneer on the walls to the flagstone...

324 Residence 5

Another long post with a bunch of updates, we'd rather make a long post and not string things along when progress is happening and there is cool stuff to see! There is a lot of exterior work to be done on the new and the existing. Much of the existing brick and stone around the entry wasn't in great shape and needed to be repaired and replaced. The big area is around that arch at the screen porch. The have...

1232 Residence Update 3

Making quick progress on the 1232 Residence, framing is getting close to complete, stucco starts next week. It is starting to take shape. In order to keep the homeowners in the kitchen as long as possible a temporary wall has been erected until all the exterior work is done to the point that the expanded family room is weather tight. With doors and windows going in it looks like that point isn't all that far away. ...