5400 Residence

We wrapped up this project a couple months ago and construction is moving along. The existing shed addition was removed and we are adding a new shop space to the existing garage. This addition will also allow more convenient access to the existing garage attic. The project includes a new arbor that matches one added on the opposite side of the house as part of a previous RDM project. Here is the existing rear of the house. The shed...

324 Residence 3

Forgot about the slab! Here is it, the contractor did a great job, nice smooth clean slab.The two steps bring you up to the first floor elevation. The new door from the exterior will also enter at this elevation. Framing is underway! The garage is starting to take shape. And here it is framed. There were some interesting challenges in connecting to the existing house. In order to clear the garage roof we changed the slope of the...

6718 Residence Update 3

With the pool issue resolved, Hurst Construction has taken advantage of the unseasonably warm weather to pour the foundations and start the framing. The screened porch foundation is sitting on a pool full of concrete.   The retaining walls on the south side of the house create a lawn that will help replace some of the backyard that will be taken up with the new screened porch and patio. ...

Bird House Studio

An Introduction to the Birdhouse Studio A first look at the Birdhouse Studio and it is already ready for the floor slab pour. The project includes a new studio art space, laundry and bath room in addition to a new, larger and more easily accessible garage. We've used the addition to create a small "courtyard" space and a sense of arrival at the secondary entrance to the the house.     The location of the house within a...