lvl Tag

RDM Architecture / Posts tagged "lvl"

1232 Residence Update 5

Things are moving along still over at 1232. Interior demolition is pretty much complete and one of the upset LVLs are in. In the photo to the right you can see everything has been removed except the walls around the stairs to the basment. The sloped portion will be concealed in a built-in cabinet/ fold-down desk. The walls visible to the right of the right image are temporary and existing walls that will remain in place until the second upset...