5235 Residence 2

Underway! Demolition shots are fun so here are a couple more. Below is the temporary bracing to put an upset beam since that was a structural wall. The visible beams in the living rooms aren't structural. New upset LVL and new hangers are installed. We'd actually planned on having the beam below the ceiling level as you can see in the renderings here but we like the ceiling plane going through into the kitchen. Electrical is in! New floor is toothed in. (We've been a...

Belvedere Update 30

This might not be the most exciting for everybody but the garage floor is finally in and the last bay of the garage has been closed in. The walls and ceiling have been spray foamed and are ready for drywall. This is one of the last big things that has been left open since the third bay of the garage was our only access to the back of the site. Another big step under way is the laying of the Wausau...

2019 Residence

Windows are in and shingles are on. It is hard to see but the panel trim is in as well and looks great. A view of the inside of the 2nd floor bedroom. The bump-out is sized for a king-size bed and the windows are located high enough to allow for a headboard and privacy from the street. This is the addition to the back of the house. Much smaller, it houses the laundry and an enlarged closet....

Belvedere Update 12

Another post on the Belvedere Project, they are coming closer together as the project continues to cruise right along. First up we've got a big start on the retaining walls and site work. Below left is a view from what will be the top of the drive down to the lower garages. We are really happy with the profile of the finished roof and the round endcaps on the the end of the ridges.  The retaining wall here steps back...