Belvedere Update 29

RDM Architecture / Perspective  / Belvedere Update 29

Belvedere Update 29

Another site visit and few new pictures. The trees are greening up and the house is getting harder to see but here is the view from the road. It is difficult to see but most of the railings are in, and the stone is pretty much done on this side.

The cast stone tile is in for the upper terrace. There is a lot of it. They are waiting on a few trim pieces and then install of that stone can begin. Also all of the cast stone caps and hand rail are installed so other than some work on the pool/spa area the upper terrace is done and ready for planting.

The interior is also approaching the finish line. The handrails for the stair are being fabricated and they are installed in the other areas. Other than the stair trim just about everything is stained. Once the top cap comes in the stair will be stained.

The entry to the butler’s pantry, stained and finished.

We’re getting excited to see this projected finished. There is a lot of landscape work still to come but the interior is getting closer and closer. Stay tuned.