A little update on Belvedere! Stone work on the patio is moving along. The columns are all have stone now, as well as the outside of the pool. Tile work on the inside of the pool has started as well. You can also see the fantastic view of the lake.

On the interior, trim work continues. Below is a shot of the doors to the lower terrace from the gathering room. Ignore the “stunt” doors and look at that lovely mahogany trim. The ceiling beams are installed and will be faux finished and stained in place.

The built-in cabinets and closet systems are starting to go in as well. Left to right, we’ve got the master closet, one half of the built-in storage in the master bedroom and the window seat in the master bedroom.

Wood and tile flooring is going in throughout the house as well. Paneling in the Great Room should be starting soon and it is going to be impressive so stay tuned!