Belvedere Framing

RDM Architecture / Perspective  / Belvedere Framing

Belvedere Framing

Framing is well underway out at the Belvedere site. The lower floor is framed and the sheathing is started, the floor above is in and framing will be starting up there soon. The project is moving right along.

The site is starting to really green up, even with just the existing trees and plantings in there its difficult to get an overall shot of the construction from the road below.

Below you can see the block shelf built up from the footing, the stone will start here and grade will be just above this point. There is still quite a bit of back fill that needs be be done. It should tuck into the site nicely once all the fill and new plantings are in.

We’ve got 4 or 5 more images of the site that I’ll post on our Facebook page here. We’ll be checking in there a little more frequently as things are happening quickly now. Look for more pictures soon.