6718 Residence Update 4

RDM Architecture / Perspective  / 6718 Residence Update 4

6718 Residence Update 4

The mild winter weather has allowed the construction to move quickly.

 The Master Closet is primed and ready to paint.

 With all of the structure exposed, the detailing in the screened porch has been challanging but Hurst Construction has been doing a great job.

The photo on the left shows the jig needed to make the cuts in the top of the posts where the rafters will sit.