6109 Residence Update 3

RDM Architecture / Perspective  / 6109 Residence Update 3

6109 Residence Update 3

Another update on the “cathedral”. The exterior shingles are done and the trim is done.

Interior foam is done and the wall insulation is also done. The tabs for the new steel tie rods are ready to go.

Sheetrock should be going in soon but until there is a complicated little section of roof that needs some attention.

We’ll have some more pictures coming up soon. Stay tuned!