324 Residence 4

RDM Architecture / Perspective  / 324 Residence 4

324 Residence 4

We are at that point in the project where things seem to slow down. Electrical and plumbing is moving along but not a whole lot changing from the exterior. The only exciting news is the new window installation.

Along with the windows there is also the skylights. For the first time you can see why we really wanted to add the pair of skylights over the stair to the second floor. Not only does it let a lot of light into the new space but it also will let some filter down the the renovated first floor.

We’ll have some more pictures as the drywall starts to go in. We are looking forward to getting some drywall up in the new second floor spaces, the master bedroom especially. We’ll be sure to post plenty of images.