Belvedere Update 16
A site visit out to Belvedere, we had a stop to make on the other side of the lake so I shot a few pictures showing the whole site. Now that the concrete walls are covered up the house is starting to blend into the site in the way we designed it. Once house wrap is covered up with stucco and the backfill and plantings are in, the house will look like its always been there.

A view of the house from below. Much of the stone is in now and you can start to get a feel for what the house will look like.

The stone on the front of the house is about half-complete and waiting for the cast stone belt course.

A close-up of the stone work to give you a better idea of the pattern and colors and the progress. To the upper left are the steel posts of the arcade. These will eventually be wrapped in the same stone as the wall.

Its been a while since we've shown much of the interior, electrical, plumbing, hvac and data are being installed and drywall will be the next step. Below left is a view from the master bedroom into the master bath. The alcove at the end with the skylight is the master shower. Just goes to show that a shower doesn't have to look like a shower from the exterior. The top right photo shows the vault in the master bedroom.

The rest of the photos will be posted on the Facebook page. Enjoy!